DREDGING 2021

A total of 133,316m3 was dredged from the entrance in August and September of 2021.

Placement locations and volumes associated with the dredging are as follows:

Estimated Sand Delivery (cubic metres)

Location

14,729

Bilinga/Tugun

59,061

Snapper Rocks East

52,181

Duranbah

7,345

Fingal