DREDGING 2021
A total of 133,316m3 was dredged from the entrance in August and September of 2021.
Placement locations and volumes associated with the dredging are as follows:
Estimated Sand Delivery (cubic metres) |
Location |
---|---|
14,729 |
Bilinga/Tugun |
59,061 |
Snapper Rocks East |
52,181 |
Duranbah |
7,345 |
Fingal |